CIMINNA
The Ciminna BESS is a project located in the township of Ciminna on a 6.73 acre (2.7 hectare) plot of agricultural land. The site is 0.5km from the 150kv Ciminna substation, 1km from Ciminna itself, and 26km from Palermo, the capital of Sicily in South Italy. Its proposed capacity is 100mw /400mwh. The connection point is into a brand new substation directly east of the existing substation. An application for authorisation was prepared and submitted to the Sicilian Department of Energy in July 2024.
CIMINNA EXTENSION
CHIARAMONTE
The Chiaramonte BESS project is located directly north of the Chiaramonte Gulfi 150kv substation, which is 15km from Ragusa in Sicily in South Italy. It is on a 6.27 acre ( 2.5 hectare) plot of land and it’s proposed capacity is 76mw/ 304mwh. The site is predominantly agricultural, and the connection point will be into the existing substation to the south. An application for authorisation was prepared and submitted to the Sicilian Department of Energy in July 2024.
CHIARAMONTE 2
The Chiaramonte 2 BESS project is located about 750m directly west of the Chiaramonte Gulfi 150kv substation, which is 15km from Ragusa in Sicily in South Italy. It is on a 8.15 acre ( 3.3 hectare) plot of land and it’s proposed capacity is 195mw/ 780mwh. The site is predominantly agricultural, and the connection point will be into the existing substation to the east. An application for authorisation is being prepared and the aim is to submit to the Sicilian Department of Energy in July 2026.
SCANDALE
TARANTO 1
TARANTO 2